Print Back
AirPouch® EZ-Tear™ Pillows and AirPouch® FastWrap™ Stock List

Automated Packaging Systems is the originator and sole manufacturer of genuine AirPouch® EZ-Tear™ pillows and AirPouch FastWrap™ bubble on demand products. Since 1962, we have been committed to providing the highest quality poly bags with the shortest lead times in the industry.

Our US plastics manufacturing processes are certified to ISO 9001:2008. Material uniformity and integrity exceed quality standards established by the Flexible Packaging Association (FPA). With multiple manufacturing facilities throughout the world, we offer the largest plastic manufacturing capacity to ensure your supply chain remains constant. AirPouch EZ-Tear pillows and FastWrap bubble on demand products use EarthAware™ biodegradable (EGDC) and recycled (RGT) materials for strength and durability that improve protection while reducing packing and shipping costs, yet are environmentally friendly. Also available is DuraClear 2000™ (DC2), a specially formulated, linear low density polyethylene with superior durability, puncture-resistance, clarity and strength.

Available exclusively for AirPouch EZ-Tear pillows is XD Blend™ material (EGXD). XD Blend is engineered using the latest polymer technologies to provide an air pillow with superior strength that also promotes sustainability. XD Blend material comes standard as an EarthAware biodegradable material at an industry leading 0.95 mil thickness

To learn more, or to place an order, please call us at 1-888-288-6224.
Unit of Measure

Specifications

Width

N/A 10 in

Length

N/A 8 in

Type

N/A Knifeless

Manufacturer

N/A Automated Packaging Systems
Tier1 N/A 1

Material

N/A Recycled

Linear Feet Per Case

N/A 4000

Mil

N/A 1.54

Note

Note

N/A
  • Features, Options & Technical Specifications subject to change
  • FastWrap bubble and tube dimensions are represented as inflated values
  • Delivery of high volume stock bag orders may differ from the normal Tier 1 and 2 stock bag lead times. Please contact your APS representative for details
  • 1 Tier 1 = 2 Working Day Lead Time
    Tier 2 = 5 Working Day Lead Time